Author Topic: About Model NAM  (Read 377 times)

sam01

  • Posts: 4
    • View Profile
About Model NAM
« on: September 25, 2017, 04:49:27 pm »
Hello everyone,
i am wondering if the model NAM could be run with "autocalibration" for 1 single storm event or the simulation period must be at least 1year.
thank you

sam01

  • Posts: 4
    • View Profile
Re: About Model NAM
« Reply #1 on: September 26, 2017, 05:38:38 pm »
the answer is yes. The model can be run with a short simulation period.